Our references

The SAINT LOUIS SUCRE NASSANDRES site entrusted to IPSB the modelling of fire scenarios at its packaged sugar and packaging storage warehouses.

The CRISTAL UNION TOURY site entrusted to IPSB the risk analysis, by the FMECA method, of its alcohol production and storage units.

The TEREOS SYRAL NESLE site entrusted to IPSB the risk analysis, by HAZOP and Bow-Tie methods, of a dryer ring.

The Ouvré et Fils Sugar Plant Distillery entrusted to IPSB the risk analysis, by the FMECA method, of its sugar storage silos.

The CRISTAL UNION FONTAINE-LE-DUN site entrusted to IPSB the risk analysis, by the FMECA method, of its carbon dioxyde production and distribution installations.

The TEREOS SYRAL MARCKOLSHEIM site entrusted to IPSB the risk analysis, by HAZOP and Bow-Tie methods, of its hydrogenation reactors and their peripheral installations.

The firm LESAFFRE FRERES entrusted to IPSB the preparation of the Building Permit Application for the extension of the production building and of a mechanic workshop on its site.

The firm DALKIA entrusted to IPSB the preparation of the Building Permit Application for the building housing the natural gas boiler on the site of the firm CHAMTOR.

The CRISTAL UNION PITHIVIERS-LE-VIEIL, CORBEILLES, d’Arcis-Sur-AUBE and TOURY sites entrusted to IPSB the preparation of the Periodic Re-examination dossier (formerly Functioning Balance) and the Technico-Economic Study on emission reduction.

The firm PROCETHOL 2G entrusted to IPSB the preparation of the Declaration dossier for its pilot unit dedicated to second generation biofuel production.

The TEREOS ORIGNY-SAINTE-BENOITE site entrusted to IPSB the preparation of Danger Studies concerning all site activities within the framework of its Technological Risk Prevention Plan.

CRISTANOL entrusted to IPSB the five-yearly revision of Danger Studies concerning all site activities.

The TEREOS CHEVRIERES, CONNANTRE and THUMERIES sites entrusted to IPSB the preparation of Danger Studies for their sugar storage silos.

The CRISTAL UNION ARCIS-SUR-AUBE site entrusted to IPSB the updating of its Operating License Application concerning all site activities.

The TEREOS SYRAL MARCKOLSHEIM site entrusted to IPSB the preparation of the Operating License Application concerning its site development projects.

The firm PIVERT entrusted to IPSB the preparation of the Declaration dossier for its Biogis Center technological demonstration unit dedicated to research and experimentation on oleaginous biomass-based plant chemistry.

SANOFI entrusted to IPSB the study, by the HAZOP method, of risks related to production and extraction processes of a pharmaceutical intermediate.

The TEREOS SYRAL Group entrusted IPSB with the mission of Project Owner Assistance for the study and follow-up of the construction of a new pre-evaporation workshop at its HAUSSIMONT site.

The TEREOS group entrusted IPSB with the mission of Project Owner Assistance for the modification of its diffusion, purification and evaporation workshop on its CONNANTRE site.

The firm CRISTAL UNION entrusted to IPSB a mission of Project Management for setting up a water tube boiler on the CORBEILLES EN GATINAIS sugar plant site.

The firm Société Vermandoise Industries (SVI) entrusted IPSB with the mission of Project Owner Assistance to study and follow-up the renovation works of its 1st and 2nd strike centrifugation workshops.

The TEREOS Group entrusted IPSB with the mission of Project Owner Assistance to study and follow-up the modernization works and recommissioning of the BENP distillery dedicated to the production of wheat alcohol.

The firm Société Vermandoise Industries (SVI) entrusted IPSB with the mission of studying and following up the construction of the storage silo No. 2 extension to raise its capacity to 116 000 tons.

The firm SAINT LOUIS SUCRE, Marseille site, entrusted IPSB with the mission of Project Management for its energy efficiency improvement plan and for extracting and refining brown sugar.

The COSUMAR Group entrusted to IPSB detailed studies to convert the Ouled Ayad sugar plant production from brown sugar to white sugar.

The Compagnie Sucrière Sénégalaise (CSS) entrusted IPSB with the mission of Project Owner Assistance for the study and construction of a bagasse combustible thermal power plant (100 thermal MW and 25 electric MW).

The CRISTAL UNION Group entrusted IPSB with the mission of Project Owner Assistance and of Project Management for the construction of a beet-based ethanol production plant on a new site

The CRISTAL UNION Group entrusted IPSB with the mission of Project Owner Assistance and of Project Management for the construction of a wheat-based ethanol production plant on a SEVESO site.

The firm ARD entrusted IPSB with the mission of Project Management for the study and the construction of an organic acid production installation.

The firm PROCETHOL 2G entrusted IPSB with the mission of Project Management for the study and the construction of a second generation biofuel production unit.

The SOUFFLET Group entrusted IPSB with the mission of Project Owner Assistance for the study of a yeast industrial production unit at its COLOMBELLES site.

The Client entrusted IPSB with the mission of Project Owner Assistance for the study and construction of a biopesticide and biofertilizer industrial production unit.

The Client entrusted IPSB with the mission of Project Management for the study and construction of an industrial production unit of food ingredients by biotechnological methods.

SANOFI entrusted IPSB with the mission of Project Owner Assistance for the study and construction of an intermediary pharmaceutical production unit by biotechnological methods.

The firm SOUFFLET entrusted IPSB with the mission of Project Management for the study and construction of a technological research and development unit dedicated to enzyme production.