Administrative and industrial risk studies

IPSB has the technical and regulatory expertise to assist you in preparing your urban planning approval and “classified for environmental protection installations” (ICPE) applications, whether you need to obtain building permits and operating licenses or control the industrial risks related to your project.

IPSB met à votre disposition les compétences et le savoir-faire de ses ingénieurs pour vous accompagner dans la réalisation de vos dossiers d’urbanisme et ICPE, vous assister dans les échanges avec les autorités administratives, tout au long de la procédure d’instruction, jusqu’à l’obtention des autorisations requises.

L’équipe Risques Industriels d’IPSB vous accompagne dans vos démarches administratives, qu’il s’agisse d’un nouveau projet industriel ou d’une installation existante :

    • Analyse des contraintes environnementales et réglementaires,
    • Etude préliminaire d’implantation,
    • Elaboration des dossiers d’urbanisme et ICPE requis,

 

  • Participation aux échanges avec les autorités administratives,
  • Assistance à l’obtention des autorisations administratives requises.

Confirmés par plus de 10 années d’expérience et de collaboration avec les instances administratives, nos ingénieurs disposent d’un savoir-faire reconnu dans l’élaboration des études suivantes :

  • Dossiers ICPE (Installations Classées pour la Protection de l’Environnement)
    • Demande d’Autorisation d’Exploiter,
    • Déclaration et Déclaration de Modification,
    • Enregistrement,
    • Etudes De Dangers et Analyses De Risques (Nœuds papillon, AMDEC, HAZOP),
    • Notification d’arrêt et Cessation d’activités,
    • Réexamen et étude technico-économique sur la base des Meilleures Techniques Disponibles,
    • Plans d’Opération Interne.
  • Dossiers d’urbanisme (permis de construire et permis de démolir).

Soucieux de la qualité des études et de la pertinence des conseils que nous vous offrons, nos dossiers administratifs s’appuient sur les référentiels en vigueur grâce à la veille réglementaire effectuée par nos ingénieurs (arrêtés ministériels, directives européennes, guides sectoriels de l’état de l’art, BREF, accidentologie industrielle…).

Enfin, notre équipe dispose de logiciels de modélisation 2D et 3D validés par les administrations pour évaluer les conséquences des scénarios accidentels (incendie, explosion…).

Our references

Application for environmental authorization
TEKNOLIKE SAS

Application for environmental authorization

TEKNOLIKE SAS has entrusted IPSB with the preparation of the environmental authorization application for its production unit of an active ingredient for pharmaceutical use in Archamps (74). IPSB supported TEKNOLIKE SAS from the upstream phase with the DREAL until obtaining the prefectural authorization order.
Application for environmental authorization
Cristal Union établissement Cristanol

Application for environmental authorization

CRISTAL UNION, an establishment of CRISTANOL, has entrusted IPSB with the execution of the environmental authorization application for its project of bio-mineralization of wheat vinasses in Pomacle (51).
Updated site hazard study
TEREOS Etablissement de Lillers

Updated site hazard study

The TEREOS plant in Lillers (62) has entrusted IPSB with updating the hazard study for its low-threshold SEVESO facility, which includes sugar manufacturing and alcohol production activities.
Site hazard study
FERROGLOBE Etablissement de Montricher

Site hazard study

he FERROGLOBE Establishment of Montricher (73) entrusted IPSB with updating the hazard study for its establishment. This site is active in the steel industry (production of high-purity silicon from quartz, as well as co-products (silica fume and slag)).
Site hazard study
FICAP

Site hazard study

FICAP has entrusted IPSB with updating the hazard study for its biofuel production site (White pellets and Black pellets obtained by steam cracking). This study notably integrated fire modeling using the FLUMilog model of different biomass storages.
Request for reporting registration
INTACT

Request for reporting registration

INTACT has entrusted IPSB with the preparation of its registration application and declaration for its new protein and alcohol production site from legumes in Baule (45). This service was preceded by a regulatory analysis of his project.
Formal Notification
Client confidential

Formal Notification

The client has entrusted IPSB with the implementation of its project to create a new production line and shipping area for frozen aromatic herbs.
Formal Notification
ICT

Formal Notification

The ICT site of Pannes (45) has entrusted the IPSB company with carrying out the notification regarding the extension of the site with the installation of a second paper machine. The objective was to present the deviations and their impacts in relation to the project planned when the site was created.
Formal Notification
Cristal Union établissement Cristanol

Formal Notification

CRISTAL UNION Etablissement de CRISTANOL has entrusted IPSB with carrying out the notification regarding its future gluten production unit from wheat.
ATEX zoning study
Client confidential

ATEX zoning study

The client entrusted IPSB with defining the ATEX zoning for the new installations planned as part of its project to increase its perfume production activity.
ATEX zoning study
TEREOS Escaudoeuvres

ATEX zoning study

The TEREOS site in Escaudoeuvres (59) entrusted IPSB with defining the ATEX zoning for its silo storage and sugar packaging facilities.
Regulatory positioning
Client confidential

Regulatory positioning

The client entrusted IPSB with the regulatory positioning of its oil extraction unit from microalgae.
Regulatory positioning
Confidential

Regulatory positioning

The client entrusted IPSB with the regulatory positioning of its future fruit and vegetable packaging site.
Process risk analyses
TEKNOLIKE SAS

Process risk analyses

TEKNOLIKE has entrusted IPSB with the performance of process risk analyses for its production unit of an active ingredient for pharmaceutical use in the APS phase using the HAZID method and in the APD phase using the HAZOP method.
HAZOP risk analyses
Client confidential

HAZOP risk analyses

The client entrusted IPSB with carrying out the HAZOP risk analyses of its pilot ore processing and purification unit.
Regulatory compliance analysis
BIOSE

Regulatory compliance analysis

The client entrusted IPSB with carrying out the regulatory compliance analysis of its storage of chemical products.